ŏ
0x
ह ह
85
...ation bua ndaie piljilonar)
Lonit edo mi bowolle .2.Y neq otnes à to eder enT Jud eldmoner bm xist ei vino „nixit not smwoɔUR Boetie ed of Lovos Toì abil eu blvoris ineeyoq SI 9 IL. I allor vitiw eda12 "I gniVOLSH .JBAI
.Sc.Ib = .quê .by roq etJNOJ
.SG.[P........
TOJONIJNOU ot sub drwJOMĀ
-merel of niyaq adiyar) mož eping Jmisilluant .DI
.amb
fanit end ni bowo. Iu .qu2 .bỵ req 00.Jà lo stai eẾT
.edrupebari Bi jnwodos
00. VI, 18.
.quê .by req úf.ò ai edat auqyolans Joeтion ent
00.5dv.
=
00.ɑSd.8..
cy.a è
.B.X DOT
Ionit nik volle troue becombet
TOJUIJNOJ od eub trOMĀ
JAHODOB
TAMIL "0_18_aretaulas adinară noi stax andrá VI
ovai dizisi ni Joeî & zniwm seu atetrulad esent
atura and Jo Jawes de Larit ant mi beƉing meec
00.3 .siv myklí *01 'S arotavind en ejJBI
04.8 zi ejZI JUSTIOD and acetedw
20. 4 Tong of Coke breeze left upon the works.
No evidence is obtainable of the existence of this
material when the works were taken over by the Government; nor of its subsequent disposal: Assuming that it was left upon the works, it be-
-came the property of the Government upon the
failure of the Contractor to complete, under
Clause of the General Conditions of Contract
No. 17 and the Contractor is not entitled to
compensation.
21. Broken brick concrete with wrought centering.
The rate allowed in the final account is in-
-adequate.
The quantity of 272 yds. cube is made up of the 3
following items:-
(a).In roof flats of thicknesses from
12" to 16" & averaging 14" thick. (b).In inner dome 6" thick at a height, of 70 ft requiring circular cir -cular casing wrought & papered. (c).In outer dome 4" thick at a height)
of 100 ft requiring double casing) circular-circular & extra labour in) packing.
Yd.sup. Yd. cube.
438 or 170
394
#
66
322
"
36
The correct rates analogous to those in Contract are
OC.VEY
00.8
Od.8ea
Biejevlad to
Innit ni bewolfa dnuOMĀ
OC.EAR....
ToJust noÛ of eub tawoná
Zi10. Jnome!) ni nivolt to atiŝtoa zero pohimikak
.ydilaun ToİTOČNE to
3 yd beretis eter İnizedam to enoidroqonq ent
.rebro moijeİwv
,8[danosmet bus Tist ei mirio '@TodoDidnoƆ edï
•
For (a) 170 y.c. @ 16.80
2856.00
*
(b) 66 y.c. @ 24.60
1623.60
) 36 y.c. @ 37.50
- 1350.00
5829.60
Deducted amount allowed in final account
Amount due to Contractor.
.61
22. Cutting tiles to shape of steps.
.SE.OTSE.
TOJUBIJNOU od sub trwJOMĀ,
-Emilion bad fual no duu taal ei .ei
Jani EA
80.0.
·TOJORINO) ou eub JiwJOM,
2448.00
3,381.60
This work was done; but is omitted in the final
account.
Allow cutting on wall tiles to 189 steps @ 20
cents each = 37.80
Amount due to Contractor.
23. Painting and Scraping steel girdera.
The only allowance in the final account for the painting of constructional steelwork included